We provided an end-to-end design and build service for this aviation project. Our brief for this 260,000ft² facility was to construct a hangar to house up to 14 Global 7500…
Having completed an Enabling Works Contract, Civils Contracting Ltd. was asked to continue to work on this project for E.ON, providing civil engineering for the construction of their newest K4…
Civils Contracting Ltd. was approached about designing and constructing a 200,000 ft² facility. The facility had to include cold stores, a fruit packing hall & 50,000 ft² mezzanine for offices.As…
In Chislehurst, we constructed a basement on a disused petrol station site. The works included decontamination and removal of the fuel tanks prior to the installation of a contiguous piled…
A new 2100m2 hangar was constructed at Lydd Airport, whilst maintaining access for aircraft to the adjacent hangar. The hangar was built to assist the airport meet the increased demand…
Civil engineering work for the Pirelli Cables Submarine Cables Investment Project. Various heavily piled foundations to support process machinery and equipment were constructed both inside and outside the existing factory…
The conversion of a former hotel into the basement car park and 16 apartments. The project involves considerable modification to the existing reinforced concrete frame building including the removal and…
Conversion of existing building from disused retail unit into new two-storey offices including, replacement of roof structure, extensive modifications to internal walls, external extensions, new M&E and data installation, high-quality…
Construction of new 8000sm steel framed factory building with a height to eaves of 10m, steel cladding to roof, steel/block cladding to walls, including machine foundations and pits. The project…