Construction of a new retail park (Next, Tapi Flooring and Aldi Food). Large amounts of earth moving and stabilising of all the building and external footprints. Installing PC retaining walls around the perimeter, permeable paving throughout the parking areas with a concrete service road to the rear of the units.
Steel frame building with various high-standard finishes to the units, including cladding, brick, Corium and curtain walling.
A Challenging project due to the high-water table, timescale and close proximity to the Rail line.
£5,000,000
Value
12 months
Programme
Traditional
Contract