A technically challenging project which involved the construction of a two-storey basement on an extremely tight site with limited access. The excavation included digging out rock below the water table adjacent to two listed buildings. The material arising from the excavation was lifted out by a tower crane 1 tonne at a time.
£3,000,000
Value
22 months
Programme
Design and Build / Traditional
Contract